Sinks and Countertops In Industrial Wasteater Treatment Installations

While most Beckart Environmental industrial wastewater treatment systems are fully PLC controlled, a properly installed sink with countertop is very beneficial to system operators:

 

  • Strategically located to allow operators convenience where they need the sink most. Easily grab wastewater sample, jar test and dispose of sample

  • Installed within close proximity of pH probe to allow for easy access to clean and calibrate

  • Hot & cold water is ideal to keep lab supplies clean

  • Work bench constructed out of corrosion resistant PVC

  • Storage of jar testing and pH calibration supplies

 

These sinks and countertops can be installed on the access platform or on ground level. The discharge from the sink is sent to the Equalization tank and treated in the batch filter press system, DAF or continuous sedimentation treatment system.

Contact Beckart Environmental to see if this design would benefit your industrial waste water treatment system.

Next
Next

Multi-Batch Wastewater Treatment System Design